December 3, 2007

Status Update: 26 November – 02 December

I started out this week pretty strongly.  I went through a lot of PPP material, including the IEATC PPP lecture.  After that my schedule went to hell.  I had a ton of work and errands this week.  I also managed to get sick.  Then we had a huge power outage in our data center (a planned power outage went horribly bad).  So I spent most of my weekend verifying network connections while coughing my guts out.  Then it snowed.  We got about 6 inches of snow which meant my drive home was a special slice of hell.

I did manage to run through Volume II lab 2 and blog a lot of it.  I still have a couple of sections to go. 

Here are my goals from last week: 

Do a lot of review on specific topics from Volume II lab 2.  Redo lab 2 with an emphasis on developing a lab strategy.  Review route redistribution (again).

I did follow up on the PPP issues that I had and I did discover some good lab strategies.  I did not get around to reviewing route redistibution again.

Goals for this week:  Do the Volume I QoS and Multicast labs.  Review route redistribution.  Find documentation for each task in the DOC.  Do Volume III lab 3.

Days Until Lab: 181
Readiness (1 to 10): 2
Lab Hours This Week 15
Study Hours This Week (estimate): 6